Bitcoin miner · Landlord (leases built data halls)

Cipher Digital (CIFR) AI data centers

Cipher Digital (formerly Cipher Mining) leases data center capacity on long contracts and does not buy GPUs. It reports 700 MW of contracted gross HPC capacity at three Texas campuses, about $16.6 billion of contracted revenue and a 17.3-year average lease term. It recognized its first HPC lease revenue in the third quarter of 2026.

Figures checked on November 18, 2026 against Form 10-Q and business update, Q3 2026 (November 2, 2026). Every number links to the document it came from.

Key figures

Cipher Digital AI data center figures with sources
FigureWhat the company reportsSource
Contracted capacity700 MW (gross)Gross power, not critical IT loadQ3 2026 business update slidesas of November 2, 2026
Operating (billing) capacity18 MW delivered to the Black Pearl tenantQ3 2026 business update slidesas of November 2, 2026
PipelineAbout 5.9 GWGross power, not critical IT loadQ3 2026 business updateas of November 2, 2026
Contract value$16.6BQ3 2026 business update slidesas of November 2, 2026
Debt$6.02B principal, then $850M of 2032 converts in OctoberForm 10-Q, Q3 2026, Notes 14 and 21as of September 30, 2026
Cash$656MForm 10-Q, Q3 2026as of September 30, 2026

A figure the company has not disclosed shows as n/a. Capacity is critical IT load unless marked as gross power, so compare like with like on the leaderboard.

Tenants and partners

  • Fluidstack, then a leading AI lab Named in a filing

    Barber Lake, 300 MW: Fluidstack lease backed by Google, then a 10-year lease directly with a leading AI lab, 20 years and about $9.1 billion in all

    Form 8-K, Sep 25, 2026
  • Amazon Web Services Named in press reports

    Black Pearl, 300 MW, 15 years plus three 5-year options, about $5.5 billion; the filings call the tenant "high investment-grade" without naming it

    StreetInsider report of the Nov 2025 lease
  • Not named (high investment-grade) Not named

    Stingray, 100 MW, 15 years plus three 5-year options, about $2.0 billion

    Q3 2026 business update slides

Landlord or GPU owner?

Does not own the GPUs. Cipher says it prioritizes a long-term colocation model; tenants bring their own compute.

How the four models differ in risk and return is explained in landlord, powered land or GPU cloud.

What Cipher Digital said on its latest call

Q3 2026 business update and call, November 2, 2026. From Business update release and slides filed with Form 8-K.

  • CEO Tyler Page said Cipher is "investing earlier in every project and advancing design work before committing to new leases".
  • ERCOT's Batch Zero process gave Colchis (1 GW) a conditional base load classification and 1.6 GW more conditional studied load with controllable-load designations; final classifications are expected in December.
  • Cipher began building lateral gas pipelines that could feed up to 2.5 GW of on-site generation, bought a 70 MW site (Horizon) due to energize in 2029, and has 270 MW available in 2027 in tenant talks.
  • Third-quarter revenue was $27 million and adjusted EBITDA was negative $10 million.

Three campuses, three long leases

Cipher's contracted portfolio sits at three West Texas sites. Black Pearl (300 MW, in Wink) mined bitcoin until February 2026 and began phased delivery to an HPC tenant in August; 18 MW of critical IT had been delivered by the November update. Barber Lake (300 MW) and Stingray (100 MW) are under construction. Bitcoin mining continues only at Odessa (207 MW).

Cipher reports capacity on a gross basis, meaning total power rather than the IT load the tenant can use, so its 700 MW is not directly comparable with the critical IT figures most peers give. Its slides give a weighted average lease term of 17.3 years and projected average annual net operating income of $864 million.

Who the tenants are

Barber Lake was first leased to Fluidstack, with Google backing the rent; the deck ties the debt amortization to that Google backstop. In September 2026 a leading AI lab signed a commitment to take a second 10-year term directly, lifting contracted revenue at the site to about $9.1 billion. The filings do not name the lab. In the same update Cipher said it committed $10 million with Fluidstack and Anthropic to Colorado City's water system.

Black Pearl's tenant is described only as high investment-grade in the filings. Its terms (300 MW, 15 years, about $5.5 billion) match the Amazon Web Services lease Cipher announced in November 2025, as reported at the time. Stingray's 100 MW tenant is unnamed.

Debt and funding

Long-term debt principal was $6.02 billion on September 30, 2026: $1.47 billion of convertible notes and $4.54 billion of project-level senior secured notes. In October Cipher added $850 million of zero-coupon convertible notes due 2032 and exchanged about $165.9 million of its 2030 notes into shares. Cash was $656 million. Bitcoin holdings fell to about 310 coins as it sold to fund construction.

Recent news

  • 2026-10-16Issued $850 million of 0.00% convertible notes due 2032 (conversion price about $15.31) and retired more than 90% of its 2030 notes. (Form 8-K, Oct 16, 2026)
  • 2026-09-24Amended the Barber Lake lease: a leading AI lab committed to a second 10-year term, adding about $5.2 billion of rent. (Form 8-K, Sep 25, 2026)

What to watch next

  • Final ERCOT Batch Zero classifications for Colchis and the 1.6 GW of studied load, expected in December 2026.
  • Delivery of the remaining Black Pearl and Barber Lake halls on the amended schedule.
  • A tenant for the 270 MW Cipher says is available in 2027.

Cipher Digital AI data center FAQ

Who leases Cipher's data centers?

Barber Lake is leased to Fluidstack with Google support and then to a leading AI lab; Black Pearl's 300 MW lease matches the Amazon Web Services deal reported in November 2025; Stingray's tenant is not named.

How much contracted revenue does Cipher have?

About $16.6 billion across 700 MW of gross HPC capacity, with a 17.3-year weighted average lease term, per its November 2, 2026 update.

Does Cipher own the GPUs?

No. Cipher builds and leases the facilities; its tenants install and own the computers.

Other companies on the tracker

Back to the AI data center tracker. This page is information, not investment advice.

Important: Educational Purposes OnlyThe data, charts, treasury tracking metrics (including mNAV and SPS), and research provided on CryptosEyes.com are for informational and educational purposes only. They do not constitute certified financial, investment, or trading advice. Digital assets like Bitcoin and Ethereum are highly volatile. Always conduct your own research and consult with a registered financial advisor before making investment decisions.